Factors Causing Time Delays Completion of Construction Projects (Case Study on Facilities Building Construction Project Sports Stage 5 Construction of The East Stand)
DOI:
https://doi.org/10.33603/jgst.v8i1.128Keywords:
Reference factor, Faktor Keterlambatan, Risk house, House of Risk, House construction, Pembangunan GedungAbstract
Inaccuracy in planning project activities during project implementation greatly affects implementation delays in the field. The purpose of the study is to determine and analyze: (1) the causal factors that contribute to project completion delays, (2) the causal factors that contribute to the dominant delay in project completion, and (3) delay risk management. In the Sports facilities (Eastern Tribune Development) project. Cirebon Regency. This study is a type of quantitative descriptive study. Data collection was done through FGD, interviews and questionnaires distributed to 10 qualified respondents in the construction sector. The resources of this study are the cause of the delay in the completion of the projects. A House of Risk (HOR) approach was used to analyze the data. Research results show that (1) Cirebon Regency Sports Facilities Building (Eastern Tribune Development) project has 14 risk events and 17 identified risk causes that cause delays. (2) Control factors that cause delays in project completion include: material factors, contract document factors, project owner factors, and contractor and design consultant factors, and (3) delay risk management options, including: (a) good communication and coordination. with the owner; (b) apply a comprehensive planning approach to procurement of materials, (c) coordinate current project drawings between consultants and field workers, (d) contact consultants and supervisors.
References
Ananda R, Mulyani E, dan Rafie, "Analysis of Delays and Quality of Work Results in Building Construction Projects," Journal Tanjungpura University, Pontianak,, pp. 1-10, 2021.
Sulaiman M, Munirwansyah, dan Azmeri, "Analysis of the causes of delays in project implementation in terms of implementation time in Aceh Province.," Journal Civil Engineering Syiah Kuala University , Vols. 1 Special Issue No. 2,, pp. 405-418, 2017.
Ramdhan, Y. S. dan Imam, B., ""Using the House of Risk Method to Analyze Delay Factors and Develop Handling Strategies: Case Study of Mall Development.," Accounting and Management Journal.,Vols. 1, No. 2, pp. 101-114, 2017.
Naahila Hunafaa Qudsy, Jojok Widodo Soetjipto and Syamsul Arifin., " Project Delay Risk Analysis Using the House of Risk Method.," Journal of Applied Civil Engineering and Infrastructure Technology (JACEIT), vol. 2 No. 1 , pp. 19 - 26, 2021.
Setiawan dan Usaman, "Optimizing Project Scheduling Using the CPM Method in the Pulomas LRT Project.," Journal of Applied Industrial Engineering,, Vols. 1, No. 2 November., pp. 12-19, 2020.
Pujawan dan Geraldin, "House of risk: a model for proactive supply chain risk management, Business Process Managemen Journal Vol. 15 pp 953-967.," Managemen Journal, pp. 953-967, 2019.
Muhammad Dany Fauzi and Said Salim Dahda, "Implementation of the House of Risk Method in Evaluation of Cable Tray Support Project Delays at PT. SSS.," Journal Serambi Engineering , Vols. VIII, No. 4, Oktober , pp. 6890-6899, 2023.
Musrifah Mardiani Sanaky, La Moh. Saleh dan Henriette D. Titaley., "Analysis of Factors Causing Delays in the MAN 1 Tulehu Central Maluku Dormitory Building Construction Project.," Journal Simetrik , Vols. 11, No. 1, Juni, pp. 432-439, 2021.
Yayuk Indah Puspitasari Jantje B. Mangare, Pingkan A. K. Pratasis., "Analysis of Delay Factors in the Casa De Viola Housing Project and Alternative Solutions.," Journal of Civil Statistics, vol. 8 No.2 February , pp. 141-146., 2020.
Levis, T., and Atherley, B., Delay construction. Langford: Cahner Books Internasional., Langford: Cahner Books Internasional., 2016.
Aibinu, A. and Jagboro, G., "The Effects of Construction Delays on Project Delivery in Nigerian Construction Industry. International Journal of Project Management, 20, 593-599.," International Journal of Project Management, pp. 593-599, 2012.
Lia Amelia Megawati dan Lirawati., "Analysis of Delay Factors in Building Construction Projects.," Journal Engineering,, Vols. 21, Nomor 2, Desember, , pp. 27-34., 2020.
Downloads
Published
Issue
Section
Citation Check
License
Copyright (c) 2024 Al Arif, Kartono , Sumirin, Moh. Faiqun Ni'am (Author)

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License that allows others to share and adapt the work with an acknowledgement of the works authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journals published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Upon receiving the proofs, the Author/Editor agrees to promptly check the proofs carefully, correct any errors, and authorize the publication of the corrected proofs.