MANAGEMENT ANALYSIS OF CONSTRUCTION PROJECT CIPAGER CHECK DAM OF KUNINGAN REGENCY

Authors

  • Dian Indra Rosdiana UNIVERSITAS SWADAYA GUNUNG JATI, Indonesia
  • Saihul Anwar UNIVERSITAS SWADAYA GUNUNG JATI, Indonesia

DOI:

https://doi.org/10.33603/jgst.v1i1.1033

Abstract

Project management is one important aspect in the application of knowledge, expertise and skills to achieve the goals or objectives that have been determined in order to obtain optimum results in terms of performance, time, quality and safety.

This study was conducted to analyze the Check Dam Project Construction Management Cipager River Kuningan start of calculating volume,implementation works, supplies (tools, labor, materials)budget plan, method, barchart, s curve, analysis critical path method and cash flow.

          The results showed that the budget plan costs incurred to complete the CipagerCheck Dam RiverOf Kuningan RegencyRp. 6.140.922.000,00(Six billion one hundred forty million Nine hundred twenty two thousand rupiah) including 10% VAT. Then by using analysis critical path method, completion takes as long as 25 weeks, or 175 calendar days.

References

Dwi Uthami, Mega. 2016.Manajemen Konstruksi Proyek Check Dam Sungai Cideres Kabupaten Majalengka.

Dipohusoda, Istimawan. 1995.Manajemen Proyek dan Konstruksi Jilid 2. Yogyakarta: Kanisius.

Ervianto. 2002.Fungsi-fungsi dasar manajemen proyek, mengelola sumber daya dalam manajemen proyek.

Husen. 2008.Definisi metode jalur kritis atau critical path method.

Irika Widiasanti, dan Lenggogeni. 2013. Manajemen Konstruksi. Jakarta: PT. Remaja Rosdakarya.

Latief, Yusuf Ir.MT.2001.Perencanaan dan Penjadwalan Proyek Konstruksi. Jakarta.

Lembaga administrasi negara. 2007.Kegiatan semu atau dummy, variasi float dari suatu kegiatan.

Reksohadipradjo. 1997.Definisi manajemen proyek.

Soeharto, Iman. 1995.Manajemen Proyek : Dari Konseptual Sampai Operasional.Jakarta: Erlangga.

Warpani, Suwardjoko. 1980.Pengertian analisis.

Downloads

Published

2018-02-28

Citation Check