ANALYSIS OF CONSTRUCTION MANAGEMENT CONSTRUCTION PROJECTS DEVELOPMENT OF FLATS OF TEGAL ALUR DKI JAKARTA

Authors

  • Akhmad Jamaludin unswagati, Indonesia
  • Saihul Anwar unswagati, Indonesia
  • Bukhori Bukhori unswagati, Indonesia

DOI:

https://doi.org/10.33603/jgst.v2i2.1288

Abstract

Location of the development project of Tegal Alur DKI Jakarta KSO.WIKA & CAKRA in the Lingkungan III Tegal Alur West Jakarta coordinates Y: 2500.000 X: 2500.000 (West Jakarta PUPR Office)

Project management is an attempt to use limited resources efficiently, effectively and on time in completing a predetermined / planned project. There are 3 activities of the basic functions of project management namely planning, implementation and control. Of the three activities are controlled resources on a project that includes manpower, equipment, materials, money and methods.

Analysis of Construction Management of Jakarta TegalAlur DKI Jakarta Project Development Project includes Analysis of Work Implementation Method, Volume Calculation and Budget Plan of Jakarta TegalAlur DKI Jakarta Development Project, Schedule Compilation at TegalAlur DKI Jakarta Flower Housing Project, Cash Flow Analysis On Development Project of TegalAlur DKI Jakarta Flats.

This research methodology is composed of several main stages, namely Preparation of Survey and Identification of Field, Seeking primary data and secondary data in related institution and department needed to complete data needed in preparation of thesis, Conducting analysis of data obtained through identification problem and make formulation, Taking conclusions and suggestions from the results of research.

With Budget Plan Cost and calculation of workload of Jakarta Flat Development Project TegalAlur DKI Jakarta resulted in Working Time Plan takes 231 days using CPM scheduling method with estimated cost of Rp. 36.690.228.549

 

Keywords         :Project Management, Bar Chart, Curva S, CPM (Critical Path Method)

Author Biography

Saihul Anwar, unswagati

http://www.profildosen.com/detail/9904011644.html

References

Dipohusodo, Istimawan., 1996, “Manajemen Proyek & Konstruksi Jilid 1â€, Yogyakarta: Kanisius.

Soeharto, Iman., 1999, “Manajemen Proyek Dari Konseptual Sampai Operasional Jilid 1â€, Jakarta : Erlangga, Edisi Kedua.

Soeharto, Iman., 2001, “Manajemen Proyek Dari Konseptual Sampai Operasional Jilid 2â€, Jakarta : Erlangga, Edisi Kedua.

Widiasanti Irika dan Lenggogeni., 2013, “Manajemen Konstruksiâ€, Bandung : Remaja Rosdakarya.

Ervianto, Wulfram., 2004, “Teori Aplikasi Manajemen Proyek Konstruksi Edisi 1â€, Yogyakarta: Andi.

Santosa, Budi., 2009, “Manajemen Proyek - Konsep & Implementasiâ€, Yogyakarta : Graha Ilmu.

Husen,Abrar.,2015, “Manajemen Proyek – Perencanaan,Penjadwalan &Pengendalian Proyekâ€, Yogyakarta : Andi.

Badri, Sofwan., 1991, “Dasar-Dasar Network Planning (Dasar-Dasar Perencanaan Jaringan Kerja)â€, Jakarta : Rineka Cipta.

Pembangunan Perumahan, PT., 2003, “Buku Referensi untuk Kontraktor Bangunan Gedung dan Sipilâ€, Jakarta : Gramedia Pustaka Utama

Rudy Gamananda, 2014. “Kajian kebutuhan tenaga kerja konstruksi pada proyek pekerjaan perencanaan dan pembangunan gedung instalasi radiologi rumah sakit paru Dr. H.A. Ratinsuluâ€.

Nuridwi, Damar Buwono, Kartika Puspa Negara, Saifoe El Unas., 2008. “Analisis Perbandingan Metode S.N.I. dan Software Ms. Project dalam Perhitungan Biaya Pekerjaan Langit-langit untuk Konstruksi Bangunan†(Studi Kasus Pembangunan Gedung II dan Bangunan Penghubung Fakultas Ilmu Sosial dan Ilmu Politik, Universitas Brawijaya Malang).

Arianto, Arif., 2010, “Eksplorasi Metode Bar Chart, CPM, PDM, PERT, Line of Balance danTime Chainage Diagram dalam Penjadwalan Proyek Konstruksiâ€.

Sarifudin., 2014, “Analisis Manajemen Pelaksanaan Proyek Hotel Grand Prima Cirebonâ€

Diharjo,Tanto., 2016, “Analisis Manajemen Konstruksi Pembangunan Ruko Grand Orchard Cirebonâ€.

Herwansyah, Diyan,. ----, “Estimasi Anggaran Biaya Konstruksi dan Rencana Penjadwalan Tahap Desain pada Pembangunan Kampus BSI Margonda – Depokâ€.

Kementrian Pekerjaan Umum., 2012, Pedoman Bahan Konstruksi Bangunan dan Rekayas Sipil “Analisis Harga Satuan Pekerjaan (AHSP) Bidang Pekerjaan Umumâ€

Somantri, Agus., 2015, “Studi Tentang Perencanaan Waktu dan Biaya Proyek Penambahan Ruang Kelas di Politeknik Manufaktur pada PT. Haryang Kuningâ€

Tolangi, Martho F, J.P. Rantung, J.E.Ch. Langi, M. Sibi., 2012, “Analisis Cash Flow Optimal pada Kontraktor Proyek Pembangunan Perumahan.â€

Arumningsih DP, Dian., ---- , “Perencanaan dan Estimasi Biaya pada Proyek Pembangunan Jembatan Patihan Kabupaten Sragen.â€

Ibrahim,Bactiar.,1993 “Estemate Real of Cost, Rencana Anggaran Biayaâ€, Padang

Downloads

Published

2018-06-29

Citation Check

Most read articles by the same author(s)

1 2 > >>