ANALYSIS OF CONSTRUCTION MANAGEMENT MAIN ROAD IN THE CISUMDAWU STA.21+200 – STA.22+825 TOLL ROAD PROJECT
DOI:
https://doi.org/10.33603/jgst.v4i1.2927Abstract
Construction management is an attempt to use limited resources efficiently, effectively and timly in completing a project that has been palnned. There are 3 kinds of basic functions of construction management including planning, implementation, and control. Of three of these activities to control the resources on aproject that includes worker, equipment, material, money, and method.
The research method used was qualitative research, as a way of collecting data on the study is how the study of the literature, interviews and direct observation in field. And this method is a method that is done to get a foundation theory in analyzing data, namely the analysis calculation of the volume of material, analysis of labor, analysis tool, method, method of Bar Chart S Curve and Critical Path Method.
The location of the studies reviewed were Main Road in the Cisumdawu STA.21+200 – STA.22+825 Toll Road Project , located on Pamatutan Hamlet Mulyasari – Pasir Hamlet Margamukti, Sumedang. The results of this research is the budget plan costs  completed the construction of Main Road in the Cisumdawu STA.21+200 – STA.22+825 Toll Road Project till the final stage more or less cost is Rp. 121.488.578.000 and analysis of the Critical Path Method (CPM) estimated completion of the Main Road in the Cisumdawu STA.21+200 – STA.22+825 Toll Road Project takes 58 weeks (406 days).
Keywords: Construction Management, Bar Chart, S Curve, Critical Path Method.
Â
References
D. Sutanto, Tanto. 2013. Analisis Manajemen Konstruksi Pembangunan Ruko Grand Orchard Cirebon. University Swadaya Gunung Jati, Cirebon.
Ervianto, & Wulfram I. (2002). Manajemen Proyek Konstruksi. Yogyakarta: Andi
Himawati, Henny Nur. 2018. Evaluasi Produktivitas Dan Biaya Operasional Alat Berat Slipform Paver Dan Dump Truck Serta Perbandingan Perhitungan Rencana Dengan Perhitungan Dilapangan Pada Pekerjaan Perkerasan Kaku ( Rigid Pavements) Jalan Tol Semarang-Solo. ETD-UGM.
PERMEN PUPR. (2016). Analisa Harga Satuan. Jakarta : PUPR
PKPPP, 2018. Analisa Harga Satuan. Dinas Perumahan Kawasan Permukiman Pertanahan Kabupaten Cirebon.
Setiadi, Deni. 2014. Analisis Manajemen Konstruksi Jembatan Kaligawe Kecamatan Susukan Lebak Kabupaten Cirebon. University Swadaya Gunung Jati, Cirebon.
Http://Dokumen .Tips Jurnal-Harga-Kota-Cirebon-2015. (2019, March) Diambil kembali dari Harga Kota Cirebon.
https://www.wirgen.de/en/products/slipform-paver/offset-slipform-pavers/sp25sp25i.php (2019, March). Diambil kembali dari Spesifikasi Paver Wirgent.
Downloads
Published
Issue
Section
Citation Check
License
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License that allows others to share and adapt the work with an acknowledgement of the works authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journals published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Upon receiving the proofs, the Author/Editor agrees to promptly check the proofs carefully, correct any errors, and authorize the publication of the corrected proofs.