ANALYSIS OF PROJECT MANAGEMENT TRANSMART CARREFOUR IN TEGAL CITY - CENTRAL JAVA
DOI:
https://doi.org/10.33603/jgst.v2i3.2142Abstract
Project implementation is said to be optimal if good project management planning so that it can be done efficiently, qualified, safe, and economical. To produce an optimal project management is required with certain methods adjusted by the project. The purpose of this study is to determine the scheduling of project time to be done by using CPM network method (Critical Path Method) which will result in the length of time of completion of the project and determine the start and end time in each work. The first step is to conduct a field survey, collecting project data such as time schedule, and basic theory. After the data collection is considered enough, then the data is determined again with the method of CPM (Critical Path Method), followed by determining how much the cost to be incurred, and then made barchart and curve S. From the research results obtained, for project implementation can be completed with time work plan 282 days or 47 weeks. But with that time there are some critical work that will affect the duration, so special attention is required on the work. And costs incurred as much as Rp 223,363,901,783.98.
Keywords : CPM (Critical Path Method), Duration of Work, Project Cost, Barchart, and Curve S
References
Badri, Sofyan. 1991. DASAR-DASAR NETWORK PLANNING (Dasar-dasar Perencanaan Jaringan Kerja). Jakarta : PT. RINEKA KARYA Basari, Rambang. 2017. JURNAL HARGA SATUAN BAHAN BANGUNAN KONSTRUKSI DAN INTERIOR edisi 36. Jakarta : PANDU BANGUN PERSADA NUSANTARA Ervianto, Wulfram I.. 2002, 2003, 2005. Manajemen Proyek Konstruksi (Edisi Revisi). Yogyakarta : ANDI Husen, Abrar. 2009, 2011. Manajemen Proyek (Edisi Revisi). Yogyakarta : ANDI Kepala Balai Jasa Konstruksi dan Informasi Konstruksi Dinas Pekerjaan Umum Bina Marga & Cipta Karya Provinsi Jawa Tengah. 2017. Harga Satuan Dasar Bahan Bangunan dan Tenaga. Peraturan Pemerintah Pekerjaan Umum dan Perumahan Rakyat Nomor 28 Tahun 2016 Tentang ANALISIS HARGA SATUAN PEKERJAAN BIDANG PEKERJAAN UMUM Santosa, Budi. 2009. Manajemen Proyek Konsep & Implementasi. Yogyakarta : GRAHA ILMU Widiasanti, Irika, dan Lenggogeni. 2013. Manajemen Konstruksi. Bandung : PT. Remaja Rosdakarya Offset
Downloads
Published
Issue
Section
Citation Check
License
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License that allows others to share and adapt the work with an acknowledgement of the works authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journals published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Upon receiving the proofs, the Author/Editor agrees to promptly check the proofs carefully, correct any errors, and authorize the publication of the corrected proofs.